Trades

Job log for drywall contractors

Behind the plasterboard sit the framing, the insulation, the vapour control layer and the services. Photograph them before boarding, and you will still know later where a cable runs and where it is safe to drill.

The problem

The ceiling or partition is finished, and the cables, insulation and noggins are gone from view. When someone drills later, or a wall cupboard will not hold, the question is what is behind the board — and only photos can show that without opening it up.

What JobOptim gives you

In JobOptim the framing, insulation and services go on the job with photos before boarding. The client follows on the progress page, and at handover a PDF report is built from the entries you select.

What to photograph

A suggestion, not a rule: these are the steps that end up hidden later.

Linear cutting calculator on CutOptim →
  1. The framing, with a tape measure in the shot
  2. Insulation and the laps of the vapour control layer
  3. Cables and boxes in walls and ceilings
  4. Noggins (for example for wall cupboards) and access panels
  5. Jointing before decorating

Work out materials right here – with CutOptim

Linear cutting calculator · Open in CutOptim →

From material estimate to handover — the CutOptim guide →

How it works

  1. 01

    Record it on site

    A photo and a short entry from your phone; you can dictate it too.

  2. 02

    The client follows

    On a link or by QR code, without an account.

  3. 03

    Hand it over

    A PDF report is built from the entries you select.

What it does not do

Frequently asked questions

How do I find a cable in the wall later?

If you photographed it with a tape measure before boarding, the entry shows where it runs. The entry stays on the job, in order.

Does JobOptim calculate stud and track cutting?

No: the cutting plan for studs and battens comes from the CutOptim linear cutting calculator.

Have the report for your next job ready by the time you get home.

Request a quoteFree account