Job log for renovations

On a renovation the strip-out crew, the electrician, the plumber and the tiler work one after the other. If everyone records on the same job, one timeline shows what was done and when.

The problem

Cables and pipes inside the walls disappear once the plaster goes on. When someone drills or repairs later, the question is where they run – and usually nobody has the answer.

What JobOptim gives you

In JobOptim every step of the renovation goes on one job with a photo and a timestamp. Tasks live on the job, the client follows on the progress page, and at handover you give them a PDF report.

What to photograph

A suggestion, not a rule: these are the steps that end up hidden later.

Rafter length calculator on CutOptim →
  1. The condition before and after strip-out
  2. Cables and pipes in walls and floors, before plastering
  3. Insulation and what is behind the plasterboard
  4. The location of hidden access panels and shut-off valves
  5. The finished room at handover

Work out materials right here – with CutOptim

Rafter length calculator · Open in CutOptim →

From material estimate to handover — the CutOptim guide →

How it works

  1. 01

    Record it on site

    A photo and a short entry from your phone; you can dictate it too.

  2. 02

    The client follows

    On a link or by QR code, without an account.

  3. 03

    Hand it over

    A PDF report is built from the entries you select.

What it does not do

Frequently asked questions

Can several people record on the same job?

Yes: members of the job team record on one shared timeline.

How much timber do I need for the roof?

JobOptim does not calculate that: the CutOptim rafter calculator does.