Trades

Job log for tilers

Waterproofing, substrate and falls end up under the tiles. Photograph them as you go, and if there is a complaint later you can show what is under the tiles.

The problem

The bathroom is finished and the waterproofing disappears under the tiles. If there is a leak or a dispute years later, the question is what was done and how – and by then the answer is somewhere in a phone gallery, or nowhere.

What JobOptim gives you

In JobOptim every step goes on the job with a photo and a timestamp. The client sees the progress on the progress page, and at handover you give them a PDF report built from the entries you select.

What to photograph

A suggestion, not a rule: these are the steps that end up hidden later.

Tile calculator on CutOptim →
  1. The substrate before you start
  2. Waterproofing layers, corner tape and pipe penetrations
  3. The fall towards the drain
  4. The tile layout before fixing
  5. Grouting and silicone at the end

Work out materials right here – with CutOptim

Tile calculator · Open in CutOptim →

From material estimate to handover — the CutOptim guide →

How it works

  1. 01

    Record it on site

    A photo and a short entry from your phone; you can dictate it too.

  2. 02

    The client follows

    On a link or by QR code, without an account.

  3. 03

    Hand it over

    A PDF report is built from the entries you select.

What it does not do

Frequently asked questions

How many tiles do I need?

JobOptim does not calculate that: the CutOptim tile calculator works it out together with the layout.

Does the client see the waterproofing photos?

Yes, if you mark the entry as client-visible: only those entries appear on the progress page.

Have the report for your next job ready by the time you get home.

Request a quoteFree account