Trades

Job log for paving contractors

The dig-out, the sub-base and the compaction end up under the paving. Photograph each step, and if it sinks or there is a dispute you can show what went underneath.

The problem

The driveway looks good, but the build-up no longer shows. If it sinks a year later, everyone asks how deep the base was and whether it was compacted – and without photos all you have is words.

What JobOptim gives you

In JobOptim every layer of the base goes on the job with a photo and a timestamp. The client follows on the progress page, and at handover a PDF report is built from the entries you select.

What to photograph

A suggestion, not a rule: these are the steps that end up hidden later.

  1. The depth of the dig-out, with a tape measure in the shot
  2. The thickness of each base layer
  3. Compaction
  4. Edging and drainage
  5. The finished surface and the jointing sand

Work out materials right here – with CutOptim

Paver calculator · Open in CutOptim →

From material estimate to handover — the CutOptim guide →

How it works

  1. 01

    Record it on site

    A photo and a short entry from your phone; you can dictate it too.

  2. 02

    The client follows

    On a link or by QR code, without an account.

  3. 03

    Hand it over

    A PDF report is built from the entries you select.

What it does not do

Frequently asked questions

Does the client see internal entries?

No. Every entry is either internal or client-visible; a “problem” entry is internal by default.

Can several people record on the same job?

Yes: members of the job team record on one shared timeline.

Have the report for your next job ready by the time you get home.

Request a quoteFree account